INSTALLATION & TRAINING
From Our Factory Floor to Yours
U.S. line: +1 (213) 526-8644, answered by our engineers 9 AM–7 PM China time, Monday to Friday.
- Direct from our factory
- Lead time confirmed in your quote
- Installation and training available
- Spare parts listed in your quote
FOUR STAGES
One project, one engineer from test to training
We run your product and your packaging at our plant. You can come and watch in person or join by video, and you sign off before the machine ships.
Crated for sea freight, with a packing list and lifting points marked. You’ll know what equipment you need to unload it.
Our engineer comes to your plant, sets the machine up on your floor and runs it on your product. Prefer to do it yourselves? We can guide your team through it by live video instead.
Operation, changeover, cleaning and daily maintenance, on your own machine, in person or by video. Record the sessions for operators who join later.
BEFORE YOUR MACHINE ARRIVES
Five things to have ready
- Power: built to your U.S. supply; we confirm the voltage with your quote
- Compressed air at the pressure and flow listed in your quote
- Floor and access: a level floor and a door the crate fits through
- Unloading: a forklift or pallet jack rated for the crate weight
- Your operators' time, booked for the training days
What ships with your machine
In the crate
A wear parts kit: seals, O-rings and the other parts you’ll replace first, listed in your quote.
A tool kit for daily adjustments and changeover.
Change parts for the formats in your order.
In the paperwork
Operating and maintenance manual in English.
Electrical and pneumatic diagrams.
Factory test record from your run.
Spare parts list with part numbers.
If your QA team needs a document we haven’t listed, ask before you order. It’s easier to add it to the package than to put it together later.
TWO WAYS TO INSTALL
On site or by video
| Engineer on site | Remote video support | |
|---|---|---|
| Best for | Full lines and first-time buyers | Single machines and teams who have run similar equipment |
| Time | Depends on the machine. We confirm it in your quote. | Scheduled around your team’s hours |
| Cost | Paid by you, quoted with your order | Free |
What buyers ask us most
About two weeks for installation and commissioning. A single machine is often quicker. We confirm the time in your quote.
Yes. The engineer who installs your machine and trains your operators works in English, on site and on video calls.
Remote video support is free. For an engineer at your plant, you cover the daily fee and travel, and we include it in your quote so you know the total before you sign.
Yes. Many customers record the training, on site or on the video call, so operators who join later can watch it.
Tell us about your site
We’ll come back with how installation and training would work for your machine.
- Reply within 24 business hours
- Factory test on your product before shipping
- U.S. line: +1 (213) 526-8644