RESOURCES

Frequently Asked Questions

Ordering, power, shipping, installation and support. If your question isn’t here, ask an engineer directly.

Before You Order
Can we test our product before we buy?

Yes. Testing is free for the machines listed on our sample testing page. Send us your packaging, and your product where needed, and we run it on the machine you’re considering. You can watch the test live on video, and we ship the finished samples back at our cost.

Is my formula kept confidential?

Yes. Your samples and test data are used for your test only. We never share your test video or results without your permission, and we’re happy to sign an NDA before you send anything.

What do you need from us for a quote?

Your product, your bottle, carton or pouch, and the output you need. A photo of your current packaging helps. Every quote comes with a free layout drawing, in PDF or CAD.

How long does it take to get a quote?

You get a budget quote within one business day, and a full itemized quote within 3–5 business days.

Do you sell single machines or only full lines?

Both. Many customers start with one machine and add to the line later.

Can you customize a machine for our format?

Yes. Most requests only need different change parts. Send us your product and packaging and we’ll tell you what changes.

Do you also supply mixing, granulation or drying equipment?

Our range covers dosage-form machines — capsule filling, softgel encapsulation and gummy depositing — and the packaging lines that follow them. If your project also needs mixing, granulation or drying, tell us what you need and we’ll scope it with you.

Can we see the machine run before it ships?

Yes. We test it on your product at our plant before it ships. You can come and watch in person or join by video, and you sign off before it leaves.

Payment and Shipping
What is the lead time?

It depends on the machine and how it’s configured. We confirm the lead time in writing in your quote.

What are the payment terms?

30% deposit with your order, and 70% before shipment, by T/T or L/C.

What shipping terms do you offer?

FOB, CIF or DDP. We prepare the export documents for your shipment.

Power and Documents
Can you build the machine for U.S. power?

Yes. Built to your U.S. supply; we confirm the voltage with your quote.

What ships with the machine?

In the crate: a wear parts kit with the seals, O-rings and other parts you’ll replace first, and a tool kit for daily adjustments and changeover. In the paperwork: an operating and maintenance manual in English, the factory test record from your run, and a spare parts list with part numbers.

What if our QA team needs a document you haven't listed?

Ask before you order. It’s easier to add it to the package than to put it together later.

Installation and Training
Who installs the machine?

You choose. Our engineer can come to your plant, or guide your team through installation and commissioning by live video.

How is installation priced?

Remote video support is free. For an engineer at your plant, you cover the daily fee and travel, and we include it in your quote so you know the total before you sign.

How long does installation take?

About two weeks for installation and commissioning. A single machine is often quicker. We confirm the time in your quote.

Does the engineer speak English?

Yes. The engineer who installs your machine and trains your operators works in English, on site and on video calls.

Can our team really install it by video?

Yes. The machine arrives tested and adjusted for your product, so setup is mostly placing it, connecting power and air, and running it. Our engineer stays on the call through every step.

Can we record the training?

Yes. Many customers record the training, on site or on the video call, so operators who join later can watch it.

Spare Parts and Warranty
How long is the warranty?

One year on the whole machine. Wear parts that wear out through normal use aren’t covered.

How do I order spare parts?

Send us the part number from your spare parts list, or a photo of the part and the machine’s nameplate. We reply with the price and lead time, and ship by air courier.

How long do spare parts take to arrive?

Lead times for critical parts are listed in your quote, so you know before you ever need one. For larger lines, such as a complete counting and bottling line, we can also keep a set of critical spares at your plant.

Can I buy parts in the U.S.?

Some standard parts, yes, and we’ll tell you which ones you can source locally. Machine-specific parts ship from our factory.

Will parts still be available in five years?

Yes. We keep making parts for the machines we’ve built, so you can still order them years after you buy.

How do we reach you when something goes wrong?

Call +1 (213) 526-8644, answered by our engineers 9 AM–7 PM China time, Monday to Friday. For videos and photos of the machine, WhatsApp us at +86 189 7157 0951. For drawings and part lists, email [email protected].

Didn't find your answer? Ask an engineer.

Questions About Specific Machines

Capsule Filling and Softgel
What capsule sizes can your capsule fillers handle?

Sizes 00 to 5, and safety capsules A to E. Depending on the model, they fill powder, granules or pellets.

Can one line make both softgels and hard capsules?

Not on the same machine. But both can share the packaging stations after them, such as counting, blister packing and cartoning, if the line layout allows.

Gummy
Can your gummy line handle both pectin and gelatin gummies?
Yes, both. Pectin and gelatin recipes need different cooking temperatures and depositing settings, and those are set on the touchscreen. Send us your recipe and we’ll confirm the setup before we quote.
Can your counting line fill gummies into bottles?
Gummies are stickier and less uniform than tablets, so we run your gummies on the counter before we quote rather than assume it will work. Send us a sample and we’ll show you the result.
Effervescent Tablets
What tablet size does your effervescent tube filler take?
Standard tooling is built for 25 mm tablets, and other sizes can be made to order. Tablets should be no more than 6 mm thick, within ±0.2 mm of each other, and harder than 5 kg, so they don’t chip in the track.
How many tablets go in one tube?
10 to 20, set on the machine. Our APK-60 also rejects any tube that is short a tablet, so a short tube doesn’t reach your cartons.
Counting and Bottling
Can your counting lines handle non-round bottles?

Yes. Our counting lines can be set up for round, square and other bottle shapes, within the size range of each model.

Blister Packing and Cartoning
What’s the difference between the DPP and DPH blister machines?

The DPP suits standard PVC blister formats and most production volumes. The DPH runs faster and is built for high-volume lines. Your tablet or capsule shape and your target output decide which one fits. Send us both and we’ll recommend one.

Can one cartoner handle both bottles and blister packs?

Yes, within the carton size range of the model. Send us your pack dimensions and we’ll confirm the fit.

Pouch and Sachet
Can your pouch and sachet machines handle both powders and liquids?

It depends on the filling head. Powders and liquids need different ones. Tell us how your product flows and we’ll confirm which machine fits.

Tube Filling and Mixing
What batch sizes do your vacuum emulsifying mixers come in?

From small pilot batches up to full production batches, depending on the model. Tell us your target output and we’ll recommend the right size.

Change Parts
Are change parts different for each machine?

Yes. Each machine has its own change-part list. Include your machine model when you contact us so we send the right part.

Still have a question?

Ask a project engineer directly. Send us your question. An engineer reads every message, not a sales team.

*An engineer replies within 24 business hours.

Scroll to Top