Stick Pack Machines for Powder Supplements

Multi-Lane Back-Seal Stick Packers on Three Film Widths

You’re paying a co-packer to fill your electrolyte sticks, or your people are doing it by hand. Our stick packers fill powder with a servo auger, and we run your powder on the machine before you order.
300, 600 and 840 mm Film
5 to 14 Lanes
Servo Auger Filling

Three Things We Need to Know Before We Can Recommend a Model

1. How Film Width Becomes Lane Count

Each lane uses about twice your stick width, plus roughly 10 mm of lap for the back seal. So a 25 mm stick uses about 60 mm of film.

Divide your film width by that and you have your lanes. A 600 mm film gives ten. A 300 mm film gives five.

Which is why a wider stick doesn’t slow the machine down — it costs you lanes.

2. Your Powder Can Also Flow Too Well

Powder fails in two directions, not one. Too damp and it bridges in the hopper and sticks to the auger — you get underfilled sticks. Too free-flowing and gravity beats the screw — you get overfill, and powder in the seal area. A spec sheet won’t tell you which end yours is on.

On the machine we fit one of three augers depending on where your powder sits — a long auger, a short auger, or a short auger with a spinner.

3. Why Stick Packs Leak
Why Stick Packs Leak

That second one — powder that flows too well — is where most leaks start. Powder that reaches the seal area before the jaws close doesn’t get sealed out. It gets sealed in.

Why Choose Our Stick Pack Machine?

Our machines are built to solve the common bottlenecks of high-speed packaging through robust engineering:

Film Unwinding Motor

Film Unwinding Motor

A motor feeds the film at a steady tension, so the film doesn’t stretch or snap as the machine speeds up.

Auto Film-Aligning Motor

Auto Film-Aligning Motor

The film position is corrected as it runs, so your printed artwork stays lined up on every stick.

Forming & Filling

Forming & Filling

A servo-driven auger meters each fill. The dosing timing is set to your powder, so fill weight stays consistent from stick to stick.

Anti-static System (Powder)

Anti-static System (Powder)

Static makes fine powder cling to the film where the seal forms. The anti-static system keeps the seal area clear, so the jaws seal film to film, not through powder.

Two Passes of Cooling

Two Passes of Cooling

The seal is cooled twice before the stick moves on, which helps keep it flat and free of wrinkles.

Servo-Controlled Cutting

Servo-Controlled Cutting

A servo-driven knife cuts each stick cleanly and adds a tear notch, so your customer can open it without scissors.

Three Film Widths

Stick width sets your lane count. Film width sets your ceiling.

Model

Film width

Lanes (25 mm stick)

Output

Best for

AIPAK-SP300P

300 mm

5

100–150 sticks/min

Your first automated stick line — one SKU, launch or pilot volume

AIPAK-SP600P

600 mm

10

200–300 sticks/min

Most supplement brands scaling past hand-filling or co-packing

AIPAK-SP840P

840 mm

16

Up to420 sticks/min

Contract manufacturers and high-volume single products

Where These Machines Are Running

Four powder categories, and they sit at different ends of the flowability range. Yours probably looks like one of these.

Electrolyte and hydration sticks
Greens and superfood blends
Protein and pre-workout single serves
Creatine, amino acids and other free-flowing powders

What changing over involves

Changing stick length is a screen setting. Changing stick width is a three-hour job. If you run more than two stick sizes, that difference is what decides your week.

What changed

What you adjust

Roughly

Same stick, new batch of powder

Nothing on the machine

—

New film roll, same size

Splice the new roll

Minutes

Stick length

Touchscreen setting

Minutes

Stick width

Forming tooling, plus fine adjustment

About 3 hours

Different powder, same stick

The auger may change — depends on how your powder flows

15-30mins

So we build the machine around your primary stick, not around every stick you might run someday. Tell us which one runs most weeks, and which ones are occasional.

If you’re switching between two very different stick widths every day, two machines will cost you less than the downtime.

What Your Plant Needs to Supply

Four utilities, and one of them is where most overseas quotes go wrong.

 

SP300P

SP600P

SP840P

Frequency / voltage

60 Hz, 480 V or 208 V — built to your local supply

  

Installed power

3.5 kW

5.5 kW

7.5 kW

Compressed air pressure

0.8 MPa

0.8 MPa

0.8 MPa

Air consumption

0.8 m³/min

0.8 m³/min

0.8 m³/min

Product contact parts

304 stainless steel standard, 316 on request

  

We build the machine to your supply. Depending on what you have at that station, a transformer or a voltage stabiliser may be part of the build — we confirm that in the quotation, before you sign, rather than at commissioning.

Air demand is the same on all three machines. It’s driven by the sealing and cutting stations, not by lane count — so don’t size your compressor by machine size.

Packing Into Cartons Too?

A stick pack line runs four stations: the stick packer, a collator that counts sticks into a stack, a checkweigher, and a cartoner. Most brands buy the stick packer first and carton by hand — that works until the cartoning bench becomes the constraint, which usually happens when the packer gets faster, not when volume grows.

You don’t have to buy the whole line at once. Tell us what’s already on your floor and we’ll tell you what’s worth adding next.

Documentation & Selection Support

Verify our quality standards and simplify your procurement process with our official documentation

Product Portfolio

Stick Pack Series Catalog

Specifications for the SP300P, SP600P and SP840P: film width, lanes, stick sizes, power, air, footprint and weight.
Quality Assurance

Compliance & Safety Certifications

CE Declaration of Conformity for the stick pack series.
Technical Standards

Patents

Patent records for our stick pack machines.

Stick Pack Machine — Frequently Asked Questions

Can you run my powder?

That’s the right question, and a spec sheet can’t answer it. Powder fails in two directions — too damp and it bridges in the hopper, too free-flowing and gravity beats the screw and floods the fill. Send us a sample. We run it, set the auger and the dosing timing against your actual powder, and send you the fill weight data. We sign an NDA before your sample ships. Shipping is on you; the test is on us. Results typically within a week.

How many lanes do I need?

Work back from your stick width. Each lane uses about twice your stick width plus 10 mm of lap for the back seal — so a 25 mm stick uses about 60 mm of film. A 600 mm machine gives ten lanes at 25 mm. Tell us your stick width and your target output and we’ll tell you which film width you need.

How fast does it actually run?

20 to 30 cuts a minute per lane. On a ten-lane machine that’s 200 to 300 sticks a minute. That’s the working range we see in production, and it moves with your powder’s flowability and your film. We don’t publish a peak rating, because a peak rating isn’t what you’ll run.

Should I use a stick or a sachet?

For a powder drink mix at production volume, a stick. A stick is a sealed tube with one seam down the back — the tube forms continuously as film comes off the roll, so only the horizontal seal is intermittent. A sachet is sealed on all four sides, which means more seal area and more dwell time per bag. Sachets earn their place when you need the print area.

How long does it take to change stick size?

Stick length is a touchscreen setting — minutes. Stick width is about three hours for the whole machine, because the forming tooling changes. If you’re switching between two very different widths every day, two machines will cost you less than the downtime.

What voltage do you build to?

60 Hz, 480 V or 208 V, built to your local supply. Depending on what you have at that station, a transformer or a voltage stabiliser may be part of the build. We confirm that in the quotation, before you sign, rather than at commissioning.

Do you install the machine in the US?

Our engineers travel to your plant, about a week per machine. Travel and on-site costs are quoted separately. Installation isn’t free anywhere — it’s either a line item or it’s inside the machine price. We quote it as a line item so you can see it.

How fast can I get spare parts?

We keep spare parts in stock at our factory. Parts typically reach you in 2–3 days, and no more than a week.

Do your machines meet U.S. electrical certification requirements?
Yes. Our machines are certified and use certified electrical components. Because the exact scope depends on the model and electrical configuration you select, our factory confirms it in writing before production.

Tell Us What You're Packing

Not sure which model ⇢

Tell us your powder and stick size

Send us a powder sample ⇢

We'll run it and send you the data

Send your full specs ⇢

Get a line quote

Scroll to Top