DIRECT FROM OUR OWN PLANT — SHANGHAI, CHINA

Counting, Gummy, Cartoning and Stick Pack Lines for U.S. Supplement Manufacturers

Every line is configured, tested and shipped by our own team. The engineers who quote your line are the ones who answer when it runs. Send us your product, your bottle and your target rate — we’ll come back with a configuration, a layout drawing and a price.

U.S. line: +1 (213) 526-8644 · 9 AM–7 PM China time, Mon–Fri
You reach our engineers, not a distributor.

WHAT WE BUILD

Four lines. Pick the one that matches what’s coming off your floor.
Each page below is written for one specific job. If your product doesn’t fit any of these, we’re probably not the right supplier — tell us anyway and we’ll say so.
Tablet Counting Line

Tablet Counting Line

Tablets · Capsules · Softgels → bottles
You’re filling 60, 90 and 120-count bottles, and count accuracy still gets verified by hand. This line counts, fills, caps, induction-seals and labels in one pass.

Gummy Line-2

Gummy Line

Cooked, deposited, cooled, demolded → bottled
You’re bringing gummy production in from a co-packer, or your current depositor can’t hold weight across a full run. Gummies are also where standard tablet counters fail — they’re tacky, irregular, and they bridge in the feeder. Send us your formula and your mold.
Cartoning Machine

Cartoning Machine

Bottles · Blisters · Sachets → retail cartons

Your bottle or blister goes into a printed carton with a leaflet. This is the machine that ends manual folding and packing.

Stick pack line-1

Stick Packing Machine

Powders · Granules → single-serve sticks
Greens, electrolytes, collagen, pre-workout. Fill-weight accuracy on low-density powder is where most stick packers fail. Send us your powder before you buy anyone’s machine — ours included.

WE ARE THE FACTORY

The people who quote your line sit in the same building as the people who assemble it.
We don’t source your machine from another shop and put our name on it.Machining, assembly, wiring and testing all happen at our plant at Shanghai. When you ask why a part is specced the way it is, the answer comes from the engineer who specced it.

2000
m²
Single plant, one roof
30+
engineers

R&D Engineers & Technical Experts

8
CNC machines
We cut our own change parts

NOT SURE WHICH ONE

Four questions we ask on every first call. Your answers usually decide the machine.
What form is your product?
Tablet, capsule, softgel, gummy or powder. Gummies stick and softgels roll — both need different counting hardware than a hard tablet. Tell us the product and we’ll tell you what it changes. This affects the counting line and the gummy line.
What's your bottle or carton?
Neck finish, bottle height, and for cartons: dimensions plus whether it’s a tuck-end or a lock-bottom. A lock-bottom carton changes the machine, not just the tooling. This affects the cartoner.
What rate do you actually need?
Not peak rate on a spec sheet. Rate at your real changeover frequency and your real uptime. We’d rather quote a machine you can run at 85% than one you can run at 40%. This affects every line.
How many SKUs share this line?
Two SKUs and twenty SKUs are different machines. If you’re running twenty, changeover time is the number that decides — not throughput. This affects every line.
HOW AN ORDER RUNS

What you get besides the machine

Configuration & quote
You send your product, bottle or carton and target rate. We send back a configuration, a layout drawing, a spare parts list and a price.
Build & in-house test
Your machine is built and run in our plant before anything ships. Your quote states the build time.
FAT with your product
We run your tablets, your gummies, your powder, your bottles and your cartons — not a stand-in. You attend in person or by video, and you sign off before the machine leaves.
Installation & commissioning
Our engineer installs, commissions and trains your operators on site. This is a paid service, quoted in your proposal.

Documentation

Every machine ships with an operating manual in English, the FAT report run on your product, material certificates for product-contact parts and a spare parts list. If your QA team needs another document, ask before you order. It’s easier to add it to the package than to produce it later.

AFTER THE LINE IS RUNNING

Who picks up when the line stops

We’re not going to tell you we have a warehouse in New Jersey. We don’t.
Here’s what we actually do, and you can hold us to it.

A U.S. number, answered by us

+1 (213) 526-8644, answered by our engineers 9 AM–7 PM China time, Monday to Friday. That's evening and overnight in the U.S., so leave a message or send a WhatsApp anytime and we'll pick it up first thing. Not a call center, and not a distributor.

A wear-parts kit ships with the machine

The wear parts you'll go through in the first year, listed and priced in your quote before you sign. No surprise invoice in month seven.

Spare parts and lead times, in writing

Every part in the kit, and the lead time for anything outside it, is written into your quote — so you know before you have an emergency, not during one.

Consigned spares in your own stockroom

For lines over full production lines, we'll place a set of critical spares at your plant. You use one, we invoice one. The part is in your building, not two states away.

Remote diagnostics

Via secure industrial VPN (e.g., eWON/Secomea) with a stable Ethernet/4G connection and a physical on-site authorization switch, our engineers can instantly access your PLC system to diagnose error logs, analyze telemetry, and fine-tune operational parameters—resolving up to 70% of software and logic issues without waiting for a technician to board a flight.

Latest Industry Insights & Technical Guides

Cartoning Speed
What Cartoning Speed Do You Actually Need?
A brochure speed comes with a particular machine and set of conditions. We'll start with how many good...
Read More
Cartoning Line Need-3
How Much Floor Space Does Your Cartoning Line Need?
You've measured the room and checked the machine's length and width. Now let's follow the product: where...
Read More
Cartoning Speed
What’s Inside a Cartoner?Let’s Follow One Carton.
In a video, a cartoning machine can look like a stream of cartons moving forward. It’s harder to see...
Read More
Lock-Bottom
Tuck-In, Lock-Bottom, or Glue? Let’s Start With Your Carton.
We look at both ends of your carton and the product inside. If you want to use a different closure later,...
Read More
Floor-Space
How Much Floor Space Does a Bottling Line Need?
Floor space for a bottling line includes more than the machines themselves. Allow for maintenance and...
Read More
Switch-SKUs-on-a-Bottling-Line
How Fast Can You Switch SKUs on a Bottling Line?
There is no single changeover time for a bottling line. Changing products while keeping the same bottle...
Read More
Bottling Line Handle Tablets
Can One Bottling Line Run Tablets, Capsules and Gummies?
One bottling line can handle tablets, capsules, softgels and gummies when the configuration has been...
Read More
each-bottle
What Line Speed Do You Actually Need for Your Output?
Start with how many pieces go in each bottle. Divide your target monthly output by the production time...
Read More
Building a new line from scratch?

Tell us what you're running.

We’ll come back with a configuration, a layout drawing and a price. If we’re not the right fit for your product, we’ll tell you that instead.

24-Hour Rapid Response

Free layout drawing with every quote.

Your formula and specs stay with us.

U.S. line: +1 (213) 526-8644

Scroll to Top