AIPAK-SP300P Stick Pack Machine for a Single SKU

You’re launching one stick SKU and a co-packer wants a minimum order you can’t justify yet. The SP300P runs five lanes off a 300 mm film at 100 to 150 sticks a minute — enough to bring that SKU in-house without buying capacity you won’t use.

  • Output — 100 to 150 sticks per minute, five lanes

  • Stick size — 20 to 70 mm wide, 50 to 180 mm long

  • Footprint — 1,200 × 1,500 mm, the smallest machine in the range

Built in our factory        |        Spare parts listed in your quote         |        Installation about a week per machine

Is this the right machine for you?

✓ Yes, if…

✕ Buy something else if…

Technical specification

Specification

AIPAK-SP300P

What it means for you

Film width

300 mm

Five lanes at a 25 mm stick

Lanes

Up to 5

Five at a 25 mm stick. Fewer lanes for a wider stick

Output

100 – 150 sticks/min

Working range from production, not a peak rating

Stick length

50 – 180 mm

Same as every model in the range

Stick width

20 – 70 mm

The narrowest range of the three. Wider stick? See the SP600P

Metering

Servo auger — long, short, or short with spinner

—

Installed power

3.5 kW

The lowest in the range

Frequency / Voltage

60 Hz, 480 V or 208 V, built to your local supply

Depending on your supply, a transformer or stabilizer may be included in the build. We confirm this with the quotation

Compressed air

0.8 MPa, 0.8 m³/min

Same as the larger models — air demand doesn’t scale down

Dimensions

1,200 × 1,500 × 2,260 mm

The smallest footprint in the range

Weight

400 kg

—

 

Model comparison

Model

Film width

Lanes 25 mm

Output

Best for

 

AIPAK-SP300P

300 mm

5

100 – 150 sticks/min

Your first automated stick line — one SKU, launch or pilot volume

You are here

AIPAK-SP600P

600 mm

10

200 – 300 sticks/min

Medium to high-speed stick pack production

View →

AIPAK-SP840P

840 mm

up to 14

Ask us

Contract manufacturers and high-volume single products

View →

All three run the same back-seal format, the same stick length range and the same servo auger metering. What changes between them is film width, and film width is what sets lane count. Output ranges are from production, not peak ratings — your powder and your film move the number.

Five lanes, one SKU

A 300 mm film gives five lanes at a 25 mm stick. That’s 100 to 150 sticks a minute, or roughly 48,000 to 72,000 sticks in an eight-hour shift. For a brand launching one SKU, that’s usually more than a co-packer minimum order and less than a machine you’ll spend two years growing into.

Servo auger metering, three auger types

Fill weight is set by the servo auger, and we fit one of three types depending on how your powder behaves. A long auger, a short auger, or a short auger with a spinner. Which one suits your powder is not something a spec sheet answers — it’s what the sample test is for.

The smallest footprint in the range

1,200 × 1,500 mm, 400 kg, 3.5 kW installed power. It fits in a corner of a room that’s already doing something else — which matters when you’re adding a format rather than building a line.

Ideal Applications & Industries

Electrolyte and hydration sticks

3 to 8 g fills, sticks around 25 mm wide. Five lanes covers a single SKU without the minimum order a co-packer needs.

Greens and superfood blends

Fibrous and hygroscopic powders sit at the difficult end of the flowability range. The auger and the dosing timing are set against your actual powder, which is what the sample test is for.

Creatine, amino acids and other free-flowing powders

Free-flowing powders at the other end of the range, where gravity can beat the screw and powder reaches the seal area. Dosing timing is what we adjust.

Probiotic and enzyme powders

Small fills in narrow sticks — 20 mm is the minimum width this platform forms. Low fill weights are where auger choice matters most.

Changeover

Changing stick length is a screen setting. Changing stick width is a three-hour job.

What changed

What you adjust

Roughly

Stick length

Touchscreen setting

15-30 minutes

New film roll, same size

Splice the new roll

15-30 minutes

Stick width

Change the format parts, then fine-tune

About 3 hours, whole machine

Different powder, same stick

Auger may change — depends on flowability

15-30 minutes

So we build the machine around your primary stick, not around every stick you might run someday.

If you’re switching between two very different stick widths every day, two machines will cost you less than the downtime.

What to check before you buy

01

Whether anyone has run your powder

Powder fails in two directions. Too damp and it bridges in the hopper; too free-flowing and gravity beats the screw. A spec sheet won't tell you which end yours is on. Ask any supplier to run a sample before you order — and ask to see the fill weight data, not just a photo of finished sticks.

02

The manual

A clear English manual gets your operator running in a week. A bad one takes a month. Ask to see a sample page before you order.

03

Installation and training

Our engineers come to your plant, about a week per machine. Travel and on-site costs are quoted separately. Installation isn't free anywhere — it's either a line item or it's inside the machine price. We quote it as a line item so you can see it.

Why Choose AIPAK?

One Point of Contact

One project engineer handles your machine from proposal to commissioning, so you’re not chasing five suppliers for one answer.

We Run Your Powder Before You Order

Send us a powder sample and we’ll run it on the machine and send you the fill weight data. We sign an NDA before your sample ships. You decide whether to talk quotes after that.

A U.S. Number, Answered by Us

+1 (213) 526-8644, answered by our engineers 9 AM–7 PM China time, Monday to Friday. That’s evening and overnight in the U.S., so leave a message or send a WhatsApp anytime and we’ll pick it up first thing.

Spare Parts and Lead Time, in Writing

A kit of wear parts ships with your machine. Every part in the kit, and the lead time for anything outside it, is listed in your quote in writing.

Deep Dive FAQ

Can you run my powder?

That’s the right question, and we can’t answer it from a spec sheet. Powder fails in two directions — too damp and it bridges in the hopper, too free-flowing and gravity beats the screw and floods the fill. Send us a sample. We run it, adjust the auger and the dosing timing, and send you the fill weight data. NDA signed before your sample ships.

How many lanes do I need?

Work back from your stick width. Each lane uses roughly twice your stick width, plus an allowance for the back-seal lap. On this machine, a 25 mm stick gives five lanes on the 300 mm film. Tell us your stick width and your target output and we’ll tell you which film width you need.

How fast does it actually run?

100 to 150 sticks a minute on five lanes, which is 20 to 30 cuts per minute per lane. That’s the working range we see in production, and it moves with your powder’s flowability and your film. We don’t publish a peak rating, because peak ratings aren’t what you’ll run.

Should I use a stick or a sachet?

For a powder drink mix at production volume, a stick. A stick is a sealed tube with one seam down the back — the tube forms continuously, so the machine runs fast. A sachet is sealed on all four sides, which means more seal area, more dwell time and a slower cycle. Sachets earn their place when you need the extra print area, or when you’re running a gel or a liquid.

How long does it take to change stick size?

Length is a touchscreen setting — minutes. Width is about three hours for the whole machine. If you’re switching between two very different widths every day, two machines will cost you less than the downtime.

Do you install the machine in the US?

Our engineers travel to your plant, about a week per machine. Travel and on-site costs are quoted separately. Installation isn’t free anywhere — it’s either a line item or it’s inside the machine price. We quote it as a line item so you can see it.

What voltage do you build to?

60 Hz, 480 V or 208 V, built to your local supply. Depending on your supply, a transformer or stabilizer may be included in the build. We confirm this with the quotation.

How do spare parts work?

A kit of wear parts ships with your machine. Every part in the kit, and the lead time for anything outside it, is listed in your quote in writing.

Is 150 sticks a minute enough?

Work it back from your volume. At 100 to 150 a minute, an eight-hour shift gives roughly 48,000 to 72,000 sticks, or about 1 to 1.4 million a month on a single shift. If your forecast is above that within two years, look at the SP600P now — you can’t add lanes to a 300 mm film.

Can I add lanes later?

No. Lane count is set by film width, and film width is set by the machine. A 300 mm machine will never run ten lanes. That’s the one decision on this page you can’t revisit, so it’s worth being honest with yourself about your two-year forecast.

Do your machines meet U.S. electrical certification requirements?

Yes. Our machines are certified and use certified electrical components. Because the exact scope depends on the model and electrical configuration you select, our factory confirms it in writing before production.

Customers Also Interested In...

Tell Us What You're Packing

Two of these fields is enough to get a real answer back. All of them gets you a configuration.

Not sure which model ⇢

Tell us your powder and stick size

Send us a powder sample ⇢

We'll run it and send you the data

Send your full specs ⇢

Get a line quote

Scroll to Top