APC-GM80Q Gummy Production Line — 80 kg/h

The smallest line we build — 8 meters, 55 kW, same depositing system as the larger ones

You’ve proved the formula and the co-packer minimum order is more than you need. The GM80Q automates the whole process at 80 kilograms an hour, in 8 meters of floor. Same servo depositing and same full-plate demolding as every line we build — just less of it.

1. Output: 80 kg/h, 25 to 35 depositing strokes a minute

2. Footprint: 8 m long, half the GM150Q

3. Power and steam: 55 kW, 80 kg/h steam at 0.4–0.6 MPa, the lowest demands in the range

4. Formula included: gelatin and pectin, free, whether you buy or not

Is this the right line for you?

✓ Yes, if…

✕ Buy something else if…

Full-Servo Screw-Driven Depositing

The depositing pistons run on servo motors with solid screw rods and linear guides. Chain-driven depositors are the common alternative — the chain stretches, and fill weight drifts after a few months. That’s a difference you see in your weight checks a year in, not on day one.

Full-Plate Demolding

Dual pneumatic cylinders drop the whole tray face at once, evenly. The alternative is plate-chain demolding, which grips the frame edges and twists the tray over time — it chips the coating and eventually damages the mold. Two soft rotating brushes finish the release without touching the mold surface.

Quick-Release Molds on a Guide Rail

Molds are fully Teflon-coated and held by fast-release buckles on a guide rail. The alternative is screw-fixed molds with a half coating — an operator, a spanner, and an uncoated area where sticking starts.

Suspended Belt with Cylinder Tensioning

The blue PU belt runs suspended off the tunnel floor with a pneumatic cylinder holding tension automatically. Belts that sit flush against the tunnel trap spilled syrup underneath — they glue down and they’re hard to clean. Mechanical tensioners wear the belt out faster.

Motor at the Tunnel Exit, Not at the Depositor

The drive motor sits at the cooling tunnel exit and pushes the mold chain rather than pulling it from the front. Front-mounted motors pull the chain unevenly, so over time the chain no longer runs level — and the depositing station loses accuracy because of it.

Vertical Dynamic Mixing

Flavor, color and actives are blended in a vertical mixer rather than a horizontal one. Horizontal mixing lets dense material — mineral powders, botanical extracts, organic acids — settle at the bottom of the pipeline. The vertical design forces the mass upward, and there’s a window so the operator can see it.

Technical specification

Specification

APC-GM80Q

What it means for you

Output

80 kg/h

—

Depositing speed

25–35 strokes/min

Slower than the larger lines, which reach 45

Dosing accuracy

≤ ±2%

Same servo depositing as every line we build

Steam

80 kg/h at 0.4–0.6 MPa

The lowest steam demand in the range

Compressed air

0.2 m³/min at 0.4–0.6 MPa

—

Installed power

55 kW, 60 Hz

Lowest in the range. Built to your U.S. supply; we confirm the voltage with your quote

Room conditions

25–30 °C, humidity ≤45%

Same at every scale

Line length

8 m

Half the GM150Q

Machine weight

2,500 kg

—

Operators

2–3

Same as the larger lines — people don’t scale down

Contact parts

SUS316L

Frame and pipework SUS304

Control system

Siemens PLC, UL or CE certified components

—

Model comparison

Model

Output

Depositing speed

Steam

Power

Line length

Best for

APC-GM80Q

80 kg/h

25–35/min

80 kg/h, 0.4–0.6 MPa

55 kW

8 m

Bringing your first gummy in-house

APC-GM150Q

150 kg/h

25–45/min

250 kg/h, 0.5–0.8 MPa

65 kW

16 m

Growing brands scaling past a co-packer

APC-GM300Q

300 kg/h

25–45/min

300 kg/h, 0.8–1.2 MPa

75 kW

18 m

Multi-shift plants and contract manufacturers

APC-GM600Q

600 kg/h

25–45/min

500 kg/h, 1.6–1.8 MPa

85 kW

20 m

Mass-market confectionery volumes

Output is in kilograms per hour, not pieces — piece count depends on your gummy weight. Tell us both and we’ll work it back for you.

All four run the same servo depositing, the same full-plate demolding and the same mold system. What changes is throughput, and what that costs you in steam, power and floor.

Industry Applications

Vitamin and mineral gummies

The largest category in the US. Gelatin or pectin base, 2.5 to 5 g a piece, usually 60 to 120 to a bottle. At 80 kg/h that’s roughly 20,000 pieces an hour at 4 g.

Pectin and vegan formulations

Pectin sets differently from gelatin and cures 20 to 24 hours against 8 to 12. Your cooling tunnel settings and your drying room both change. Tell us which base before we quote.

Functional and botanical gummies

Ashwagandha, elderberry, apple cider vinegar. Dense botanical extracts settle in horizontal mixing lines — that’s what the vertical mixer exists for.

What changing over involves

Changing shape is a mold swap. Changing base is a different conversation.

What changed

What you adjust

Roughly

Same shape, new flavor or color

Recipe on the screen, flush the mixer

30–60 minutes

Different gummy shape

Swap the mold trays — quick-release buckles on a guide rail, no screws

30–60 minutes

Gelatin → pectin

Cooling tunnel settings and your drying room. Pectin cures 20–24 hours against 8–12 for gelatin

Not a changeover — a process change

Different piece weight

Depositing stroke on the servo, and possibly the manifold

30–60 minutes

Molds are fully Teflon-coated and held on a guide rail with fast-release buckles. The common alternative is screw-fixed molds with a half coating — those take an operator and a spanner, and the uncoated area is where sticking starts.

What your plant needs to supply

Utilities

Steam — the volume and pressure depend on the line size, listed in the specification table on each model page. Compressed air. Electricity, water inlet and drainage.

Air handling

Two dehumidifiers — one for the cooling area, one for the packing room. Two air conditioners, same two rooms.

Room conditions

Forming area: 25–30 °C, humidity 45% or below. Cooling tunnel: 5–10 °C. Drying room for pectin: 25–30 °C, humidity 25–45%.

What we supply

The line, the layout drawing, installation, operator training — and the formula if you don't have one.

Two things worth raising early. Steam is the one most buyers overlook — if you don’t have a boiler, tell us and we’ll quote the electric heating option instead. And no machine fixes a room that swings: if you can’t hold the forming conditions yet, say so before you order, not at commissioning.

What to check before you buy

01

Weight consistency, checked over time

A servo depositor and a chain-driven one both hit spec on day one. Ask any supplier what their fill weight looks like after six months of running, and how they verify it at the factory acceptance test. That's the number that decides your giveaway.

02

The manual

A clear English manual gets your operator running in a week instead of a month. Ask to see a sample page before you order.

03

Installation and training

Installed, commissioned, and your people taught to run the line. Ask what's included and what costs extra — the answer varies more between suppliers than the machine price does.

Why Choose AIPAK?

One Point of Contact

One project engineer handles your line from layout drawing to commissioning, so you’re not chasing five suppliers for one answer.

Free Formulas, Whether You Buy or Not

Gelatin and pectin production formulas, with ingredient ratios and process steps. Yours whether you buy from us or not.

A U.S. Number, Answered by Us

+1 (213) 526-8644, answered by our engineers 9 AM–7 PM China time, Monday to Friday. That’s evening and overnight in the U.S., so leave a message or send a WhatsApp anytime and we’ll pick it up first thing.

Spare Parts and Lead Time, in Writing

A kit of wear parts ships with your line. Every part in the kit, and the lead time for anything outside it, is listed in your quote in writing.

Questions About the APK-GM80Q

How does the vertical dynamic flavor & colors mixer handle high-density ingredients without separation?

Horizontal mixing lets dense material — mineral powders, botanical extracts, organic acids — settle at the bottom of the pipeline, so the first and last gummies in a run don’t get the same dose. The vertical mixer forces the mass upward and keeps dense actives in suspension through the run. There’s a window so the operator can see it.

Why are stainless steel water pipelines used in the circulation loop instead of standard flexible tubes?

Flexible tubes kink, blister and crack with repeated heating and washdowns. The circulation loop is rigid stainless steel pipe, so it doesn’t degrade and doesn’t leak at the joints when the line is washed down.

How does full-plate mechanical demolding protect the molds compared to plate chain systems?

Plate-chain demolding grips the edges of the mold tray, which twists it over time and chips the non-stick coating. Full-plate demolding uses two pneumatic cylinders to press the whole tray face evenly, and two soft rotating brushes finish the release without touching the mold surface.

Can the line be washed down?

Yes. The electrics are rated IP65, and every sensor and heater connects through a water-resistant aviation plug. Your crew can wash down the frame, the inside of the cooling tunnel and the hopper without covering the electrics first.

What does the solenoid oil sprayer do on a long run?

An open valve drifts as the pressure changes, so someone has to keep adjusting it, and it keeps dripping if it’s left on after the shift. The sprayer on this line is solenoid-controlled: once the volume is set, it stays the same through the run, and it stops when the line stops.

Do you provide the formula?

Yes, free. We’ll send you production formulas for both gelatin and pectin, with ingredient ratios and the process steps. You don’t have to buy from us to have them.

What room conditions does the line need?

Forming at 25–30 °C with humidity 45% or below. Cooling tunnel at 5–10 °C. For pectin, a drying room at 25–30 °C and 25–45% humidity for 20 to 24 hours. Gelatin cures faster, 8 to 12 hours. If you can’t hold these yet, tell us early — it changes what we’d recommend.

What if I don't have steam?

The cooker can be built with electric heating instead. Tell us at enquiry rather than after the quote — it changes the build and the price, and it’s much easier to specify than to retrofit.

Can I add capacity to this line later?

Not to this line — output is set by the depositing head and the cooling tunnel. What you can do is run it as a second line when you buy a bigger one, which is what several of our customers have done. If your two-year forecast is well above 80 kg an hour, look at the GM150Q now.

Does it run on US power?

Yes. We build to your U.S. supply at 60 Hz and confirm the voltage with your quote.

How do spare parts work?

A kit of wear parts ships with your line. Every part in the kit, and the lead time for anything outside it, is listed in your quote in writing.

Customers Also Interested In...

Machines that usually sit next to this one:

Not sure which line size?

Tell us your target output in kg per hour and your piece weight. We'll tell you which one, and why.

Send us your formula — or ask us for one

If you have a formula we'll tell you what the line needs to run it. If you don't, we'll send you ours. Free, either way.

Send your floor dimensions

Length, width, height, and where the doors and columns are. We'll draw your line against your actual room.

Reply within one business day. Formulas sent free, whether you buy or not.

Scroll to Top